Our History RCG
Rigid Concrete Group Inc. was founded on a commitment to quality concrete construction, precision execution, and long-term performance. From our early beginnings, we have steadily grown by focusing on strong fundamentals, professional workmanship, and client trust.
- Home 01
- History
Let’s See Our Process
From consultation and planning to execution and completion, our process is focused on safety, efficiency, and long-lasting results.
Stage 1: Footing Construction
The first stage focuses on establishing a strong and stable base for the structure. This includes layout verification, footing formwork installation, reinforcement placement, and concrete pouring in accordance with approved drawings and building codes. Proper execution at this stage ensures accurate load transfer and long-term structural performance.
View More
Stage 2: Formed Foundation Walls
In the second stage, reinforced concrete foundation walls are formed and poured. Our team installs precision formwork, places reinforcement steel, and ensures correct alignment, dimensions, and elevations. This stage creates a durable and structurally sound foundation system capable of resisting vertical and lateral loads.
View More
Stage 3: Concrete Slabs
During the final stage, a dedicated slab team completes basement and structural concrete slabs. This includes preparation of the sub-base, installation of vapor barriers and reinforcement (as required), concrete placement, leveling, finishing, and curing. The result is a smooth, durable slab built for long-term performance and daily use.
View More
